Freight Tender Specifications
Definition and general information
Freight tender specifications (also statement of requirements or tender specifications) describe which transport service a shipper wants to buy in a freight tender and under which conditions it has to be performed. They are the core content of the tender documents: on this basis, freight forwarders and carriers calculate their prices and check whether they can meet the requirements with their vehicles, staff and processes.
The specifications usually cover general requirements that apply to all transport, for example on safety, quality, insurance and documentation, as well as lane-specific requirements per transport relation, such as goods, vehicle and equipment, loading and unloading points and their rules.
In many industries, shippers or associations publish general requirements profiles that companies include in tenders and contracts and supplement with their own requirements. In the chemical industry, for example, the German Chemical Industry Association (VCI) has published a requirements profile for road haulage and multimodal transport, which companies such as Evonik refer to in their own requirements profiles. Public authorities also describe the required service in a specification, for example the UK government in its 2019 tender for freight capacity.
Sources:
- VCI (2023) – Requirements Profile on Road Haulage and Multimodal Transport (accessed 26 November 2026)
- Evonik (2025) – Requirements Profile for Road Freight and Combined Transport (Bulk Transports) (accessed 26 November 2026)
- UK Government (2019) – Freight Capacity Procurement: Specification of Services (accessed 26 November 2026)
What do freight tender specifications contain?
General requirements for the service provider, e.g.:
- company profile, certifications, insurance and emergency plans
- condition and equipment of vehicles, containers and equipment
- qualifications, instruction and documents of drivers
- safety, environment and sustainability, such as CO₂ reporting
- use of subcontractors, schedule adherence, status updates, handling of damage
- management system and audits, in chemicals often based on SQAS
Lane-specific requirements per transport relation, e.g.:
- loading and unloading point with address, opening hours, access and check-in rules
- goods, dangerous goods classification, volumes and type of load (bulk, packaged)
- vehicle type and equipment, such as tanker, silo, reefer trailer, hoses, pumps, load securing
- product requirements, such as temperature, cleaning and previous cargo restrictions
- safety and site rules, such as PPE, documents, instructions at the loading point
General requirements rarely change. Lane-specific requirements, by contrast, differ from relation to relation and change with every site, product or customer.
Sources:
- VCI (2023) – Requirements Profile on Road Haulage and Multimodal Transport (accessed 26 November 2026)
- Shell (2019) – General Requirements for Road Transport Carriers, Version 12 (accessed 26 November 2026)
- INEOS Oxide (2026) – FCA Liquid Bulk: Site Requirements (accessed 26 November 2026)
How do specifications differ from the freight tender itself?
- Freight tender: the entire procurement process, from preparation and RFI through RFP and RFQ to award and monitoring.
- Specifications: the content part of the tender documents that describes the service and the conditions.
- Load tender: the request for an individual shipment in day-to-day operations, after the award.
After the award, the specifications usually become part of the framework contract and remain the basis for individual transport orders.
Sources:
- DAT Freight & Analytics (2023) – The Ultimate Guide: An In-Depth Look at Shipper RFP Best Practices (accessed 26 November 2026)
What are the specifics in different industries?
- Chemicals: Requirements profiles call for, among other things, evidence of tank cleaning, previous loads and product residues for bulk transport, and load securing for packaged goods; audits are often based on SQAS. Shippers such as Shell or INEOS also publish site-specific requirements.
- Food and pharmaceuticals: The focus is on temperature control, hygiene, cleaning and dedicated vehicles.
- Retail and consumer goods: Time slots, dock and pallet requirements, and shipment data and labels according to GS1 standards are important.
- Sustainability: Across industries, the Smart Freight Procurement Guidelines recommend including emissions KPIs and reporting requirements in tender documents and contracts.
Sources:
- VCI (2023) – Requirements Profile on Road Haulage and Multimodal Transport (accessed 26 November 2026)
- Cornell LII (n.d.) – 21 CFR § 1.908 (accessed 26 November 2026)
- GS1 (2019) – GS1 Logistic Label Guideline, Release 1.3 (accessed 26 November 2026)
- Smart Freight Centre, WBCSD (2019) – Smart Freight Procurement Guidelines (accessed 26 November 2026)
Challenges with freight tender specifications
Lane-specific requirements are scattered
General requirements profiles are usually available centrally. Requirements for individual loading and unloading points and products, however, are found in site instructions, customer specifications, ERP free text and the knowledge of individual employees. They have to be compiled again for every tender, often for hundreds of lanes.
Incomplete information leads to inaccurate bids
If information on equipment, time slots, cleaning or site rules is missing, providers price on assumptions. Deviations only appear after the award, for example as surcharges, renegotiations or rejected loads. DAT points out that awarding on price alone can lead to rejected loads and more expensive spot market transport.
Spreadsheets and PDFs instead of structured data
Specifications are often sent as Excel spreadsheets and PDF documents. Each bidder transfers the information into its own systems, questions are handled by email, and changes have to be sent to everyone. Different wordings for the same requirement make comparison harder.
Specifications become outdated after the award
After the award, site rules, opening hours or product requirements change. If the specifications are not updated, providers work with outdated information during the contract.
Sources:
- DAT Freight & Analytics (2023) – The Ultimate Guide: An In-Depth Look at Shipper RFP Best Practices (accessed 26 November 2026)
- VCI (2023) – Requirements Profile on Road Haulage and Multimodal Transport (accessed 26 November 2026)
Loady's approach
Provide lane-specific requirements as structured data
In Loady, shippers maintain the requirements that freight tender specifications need per lane once, centrally, as structured data. This is based on the Loady data model with fixed fields instead of free text, organised into topics such as safety requirements, check-in and access, technical equipment, opening hours, vehicle restrictions and driver information. Requirements are available at site, loading and unloading point and product level, for example:
- loading requirements and loading point infrastructure
- access restrictions such as side loading, rear loading and chassis orientation
- PPE at the loading or unloading point
- temperature requirements, cleaning requirements and previous cargo restrictions
Manage tenders lanes in Loady
With tender management, lanes are assigned to a tender and managed on a central page. Tenders including lanes and pickup&delivery requiremnents can be published and closed, carriers are notified automatically, and the status changes automatically once a carrier is assigned. A lane can be part of several active tenders, tender specifications can be extended, and logistics service providers can be included as a separate company type.
The same data for tendering and operations
The requirements used in the tender are the same ones that later apply to the transports. Partners see them in their own language via Loady2Share or the view for dispatchers. Via APIs, the data flows into ERP, TMS and procurement systems such as SAP, Oracle, Transporeon or Coupa. With LoadyConnect, changes made by the data owner are passed on automatically to connected partners.
Key benefits of Loady
- lane-specific requirements as structured data instead of scattered documents
- tenders, lanes and carrier assignment in one place
- the same data basis for tendering, contract and operations
Related entries
- Freight Tender
- Loading and Unloading Instructions
- Previous Cargo Restrictions
- Pickup Requirements
- Delivery Requirements

