Delivery Requirements
Definition and general information
Delivery requirements are the rules a consignee sets for the suppliers, carriers and drivers delivering goods to its site. They cover, for example, advance notice and time slots, delivery documents and labelling, pallets and load units, the vehicle and unloading procedures. They are usually published as delivery conditions, supplier logistics manuals or receiving standards.
Their counterpart is the loading site's pickup requirements. Delivery requirements affect the whole chain before arrival: the supplier has to prepare goods and documents accordingly, and the carrier has to assign a suitable vehicle and keep to the appointment.
Sources:
- Myer (2026) – Domestic Receiving Standards (accessed 24 November 2026)
- GS1 Germany (n.d.) – Effiziente Wareneingangsabwicklung im FMCG-Bereich (in German; accessed 24 November 2026)
What do delivery requirements cover?
- Advance notice and time slots: pre-notification, slot booking, receiving hours. Example The Warehouse Group (retail, New Zealand): no booking, no delivery; vehicles arriving more than 30 minutes before or after the booked time are turned away.
- Delivery documents and data: delivery note, purchase order number, advance shipping notice (ASN), barcode labels. Example Myer (retail, Australia): each load unit carries exactly one valid SSCC label.
- Pallets and load units: pallet type, height, weight, stackability, wrapping. Example Myer: maximum pallet height 1.8 metres, no plastic or damaged pallets. Example ZEG (bicycle trade, Germany): maximum 400 kilograms and 2 metres per pallet; stacked pallets may be treated as a defect.
- Unloading and conduct on site: who unloads, which protective equipment applies, which induction is needed. Example ZEG: unloading is done by its own staff, and the driver wears safety shoes. Example Myer: drivers must complete a site safety induction.
- Temperature and product protection: Example medicinal products: under the EU guidelines on Good Distribution Practice (GDP), the required storage conditions must also be maintained during transport.
- Technical information on the unloading point: for bulk, for example connections, hose lengths and safety rules. Example chemicals: Cefic, ECTA, FETSA and FECC developed the uniform SULID form for loading and unloading points.
Who sets delivery requirements?
Usually the consignee or the operator of the warehouse where the goods arrive. In retail they often apply to all suppliers of a distribution centre; in industry they frequently differ by plant and unloading point. According to GS1 Germany, the sender and carrier must keep to agreed time slots if these are set in the purchase contract. If the carrier cannot meet them, this has to be resolved with the sender in advance.
What rules apply to deliveries?
- Dangerous goods – ADR section 7.5.1: the vehicle, driver and documents must also be checked on arrival at the unloading place. ADR applies in all contracting parties to the UNECE agreement.
- Medicinal products – EU guidelines on Good Distribution Practice of medicinal products for human use (2013/C 343/01), Chapter 9: storage conditions must be maintained during transport, and deliveries are made to the address stated on the delivery note.
- Perishable foodstuffs – UNECE ATP Agreement: for international transport, it specifies vehicle types and temperatures.
- Safety on site – Example United Kingdom: the Health and Safety Executive (HSE) advises that safety arrangements for deliveries be assessed when the order is placed, and recommends a written delivery plan for regular deliveries.
Note: This overview lists selected regulations and is not exhaustive. Depending on the goods, mode of transport and country, further regulations may apply; the version in force at the time is authoritative (as of November 2026). It does not constitute legal advice.
Sources:
- The Warehouse Group (2026) – TWG Local Booking and Delivery Guide (accessed 24 November 2026)
- Myer (2026) – Domestic Receiving Standards (accessed 24 November 2026)
- ZEG (n.d.) – Anlieferbedingungen (in German; accessed 24 November 2026)
- GS1 Germany (n.d.) – Effiziente Wareneingangsabwicklung im FMCG-Bereich (in German; accessed 24 November 2026)
- Cefic, ECTA, FETSA, FECC (2011) – Guidelines on how to use the Site (Un)Loading Information Document (SULID), Revision 4 (accessed 24 November 2026)
- European Commission (2013) – Leitlinien für die gute Vertriebspraxis von Humanarzneimitteln (2013/C 343/01) (in German; accessed 24 November 2026)
- UNECE (2024) – Agreement on the International Carriage of Perishable Foodstuffs (ATP), ECE/TRANS/347 (accessed 24 November 2026)
- UNECE (2024) – ADR 2025, ECE/TRANS/352 (accessed 24 November 2026)
- Health and Safety Executive (n.d.) – Delivering safely (accessed 24 November 2026)
Challenges with delivery requirements
Every consignee has different rules
Even pallet rules differ considerably: The Warehouse Group allows a maximum of 1.5 metres and 800 kilograms, Myer 1.8 metres, ZEG 2 metres and 400 kilograms. Suppliers and carriers delivering to many consignees have to know and meet each of these rules.
Advance notices and documents are missing or incomplete
According to GS1 Germany, consignees often receive no documents at all, or documents that lack required information. Without an advance shipping notice, the consignee cannot clearly match the goods.
Time slots are scarce, waiting times costly
GS1 Germany names insufficient availability of time slots and unplanned dwell times at the ramps as points of conflict. Unplanned waiting times increase the effort in all downstream processes.
Rejections cost suppliers and carriers
Deliveries that do not meet the rules are turned away. Example Myer: a missing ASN, incorrect labels, pallets that are too high or no booking lead to rejection; the supplier and carrier bear the costs, including freight.
Sources:
- The Warehouse Group (2026) – TWG Local Booking and Delivery Guide (accessed 24 November 2026)
- Myer (2026) – Domestic Receiving Standards (accessed 24 November 2026)
- ZEG (n.d.) – Anlieferbedingungen (in German; accessed 24 November 2026)
- GS1 Germany (n.d.) – Effiziente Wareneingangsabwicklung im FMCG-Bereich (in German; accessed 24 November 2026)
Loady's approach
One format for all consignees
With Loady, consignees maintain their requirements once, centrally, as structured data in the Loady data model, which is the same for all users. Suppliers and carriers therefore find the rules of different consignees in the same structure, for example on check-in and access, technical equipment, opening hours, vehicle restrictions and driver instructions.
Unloading requirements per site and unloading point
Unloading requirements are held in Loady at site and unloading point level, together with the available infrastructure and, where needed, temperature requirements such as the unloading temperature range.
Opening hours without contradictions
Opening hours of loading and unloading points are checked in Loady when they are entered: intervals must not overlap, and the start must be before the end.
Sharing requirements before arrival
With Loady2Share, suppliers and carriers can view the unloading requirements via a shared link, even without their own Loady account and in their own language. Through standard APIs and integrations, the data flows into ERP, TMS and procurement systems such as SAP, Oracle, Transporeon or Coupa.
Key benefits of Loady
In Loady, delivery requirements are held as structured data per site and unloading point. Consignees maintain them once; suppliers and carriers see them before delivery in the same format.